[dsg-hallb_rich] EEL 124 cleanroom project

Marc Mcmullen mcmullen at jlab.org
Wed Nov 17 09:52:33 EST 2021


Hi Patrizia,

The contractors have completed the floor in the clean room. The surface is smooth and looks good, although there is a slight variation in the shade. This is because the job was done in two parts. This should not affect the functionality of the floor. Today the walls will be wiped down, and later this week facilities management will change out all the filters. The floor will be fully cured (11/24) and ready for RICH II assembly by the time we all return from the Thanksgiving holiday.

Thanks,
Marc

[cid:2ea9f0cc-4e61-4838-8aec-7b75a472b421]
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_rich/attachments/20211117/d6794ecd/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: IMG_2029.JPG
Type: image/jpeg
Size: 2484466 bytes
Desc: IMG_2029.JPG
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_rich/attachments/20211117/d6794ecd/attachment-0001.jpe>


More information about the dsg-hallb_rich mailing list