[dsg-hallb_rich] [EXTERNAL] Re: RICH-II hardware interlock system components moved to cleanroom

Valery Kubarovsky vpk at jlab.org
Tue Mar 29 18:21:07 EDT 2022


I opened GUI and even connected one sensor. It is on electronic panel now. Everything is working.

Valery
________________________________
From: dsg-hallb_rich <dsg-hallb_rich-bounces at jlab.org> on behalf of Marco Mirazita <Marco.Mirazita at lnf.infn.it>
Sent: Tuesday, March 29, 2022 5:36:29 PM
To: Tyler Lemon <tlemon at jlab.org>
Cc: dsg-hallb_rich at jlab.org <dsg-hallb_rich at jlab.org>
Subject: [dsg-hallb_rich] [EXTERNAL] Re: RICH-II hardware interlock system components moved to cleanroom

Hi Tyler,
I tried but nothing opens up and I get the attached error message.
Marco


Il 2022-03-29 22:38 Tyler Lemon ha scritto:
> Hello,
>
>  On the Linux server connected to the set of four screens in the
> cleanroom (hostname is clonpcsvt), when you log in as clasrun, there
> should be a link in that account's home directory to
> "richii-hw-intlk".
>
>  This executable will open up a user interface for the hardware
> interlock system to be able to read all sensor values, set interlock
> limits, and enable individual sensor's interlock.
>
>  The screens are still a work in progress (one of the tabs will be
> updated to graphically show where the sensors are in RICH), so the
> user interface was set up in this way to allow easier updates.
>
>  -Tyler
>
> -------------------------
>
> From: dsg-hallb_rich <dsg-hallb_rich-bounces at jlab.org> on behalf of
> Tyler Lemon <tlemon at jlab.org>
> Sent: Tuesday, March 29, 2022 1:14 PM
> To: dsg-hallb_rich at jlab.org <dsg-hallb_rich at jlab.org>
> Subject: [dsg-hallb_rich] RICH-II hardware interlock system components
> moved to cleanroom
>
>  Hello,
>
>  The RICH-II hardware interlock chassis, sensor cabling, and sensors
> have been moved into/near the cleanroom.
>
>  The chassis is in the rack in EEL 125 with cabling running under the
> roll up door.
>
>  The cables and sensors are in two sets of boxes inside the cleanroom
> near the roll up door.
>
>  The first set of boxes is for the electronic panel (EP) sensors
> (there's a sign on the boxes). There are two boxes in this set. The
> first box has twelve, 100-ft cables for connecting the interlock
> chassis to the EP patch panel. The second box has twelve cables for
> connecting the EP patch panel to the sensors (~50-ft long) with the
> sensors connected to the end. There is also one, thin cable with a
> LEMO cable for connecting to the hardware interlock chassis to the
> CAEN.
>
>  The second set is in one box for the N2 volume sensors. There is only
> one box in this set that contains both twelve, 100-ft cable for
> chassis to feedthroughs and twelve, 50-ft cables with sensors on the
> end of it. There are also the two feedthroughs for the N2 volume in
> this box.
>
>  Soon, I'll set up an EPICS screen in the cleanroom so the sensors can
> be monitored when they're plugged in.
>
>  If during the process of installing the sensors, there are any
> sensors that don't work, just let me know and I'll replace the sensor
> with a spare, or replace the cable connected to the sensor.
>
>  -Tyler
> _______________________________________________
> dsg-hallb_rich mailing list
> dsg-hallb_rich at jlab.org
> https://mailman.jlab.org/mailman/listinfo/dsg-hallb_rich
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_rich/attachments/20220329/689b830a/attachment.html>


More information about the dsg-hallb_rich mailing list