[dsg-svt] R4 cable lacing

Brian Eng beng at jlab.org
Wed Dec 7 15:26:55 EST 2016


I think we're in better shape, although obviously not as good as using connectors, in regards to the cabling compared to last time.

We've already added labels to the ambient sensors (at least for the R1-R3 ones, not sure about R4) as well as color coding the cables by region on both ends; near where the bundle comes out of the tube and at the crate end.

Last time we couldn't leave the SC cables attached because other cables were interleaved with them. This time we might be able to?

Mindy/Sahin (or anyone else for that matter) if you have any ideas on how to make things easier/faster feel free to try them out.

One thing that won't change is that the routing is probably going to be messy again, especially since we're getting less time; mainly because the detector is going to get moved again so no point in spending time to route it nicely. I do have some different mounts to try on the cart though.

----- Original Message -----
> From: "Yuri Gotra" <gotra at jlab.org>
> To: dsg-svt at jlab.org
> Sent: Wednesday, December 7, 2016 12:37:22 PM
> Subject: [dsg-svt] R4 cable lacing

> SVT is powered off, R4 cable lacing can now be done.
> 
> In preparation for the KPP please review the procedures of disconnecting
> the cables on the crate side and reconnecting them to the crates in the
> service cart. The test in August showed that cable labeling, handling,
> and routing needs improvement. The KPP schedule allows 4 days for SVT
> installation. All cables should be properly labeled. cable bundles
> should be arranged in groups corresponding to the crates to which they
> will be connected. Due to the budget constrains we won't have the patch
> panel boards and the slow control cables modified before KPP. I
> recommend to consider leaving the slow control cables connected to the
> boards during SVT transportation. This would significantly speed up the
> cabling.
> 
> SVT will be powered up and tested for operation stability in the
> following weeks and during the first weeks of  January.
> 
> SVT should be ready for transportation (cables disconnected, arranged,
> crates installed in the service cart, monitoring system installed in the
> counting house, network parameters configured) by January 20.
> 
> Thank you.
> 
> 