I connected and strain relieved R3 cables and started testing the inner
barrel. There is a minor issue with R3S10T slow control cable that needs
to be repaired.
For the next week, after testing R1-R3 the cables need to be tied to the
support tube. R4 work will continue with testing, rotating and mounting
on the tube. I finished kludging all modules which were removed from the
barrel, checking current stability on the test stand.
Sahin and Todd, let's meet in EEL124 at 8 am on Monday.