[dsg-svt] SVT work next week

Brian Eng beng at jlab.org
Mon Nov 7 09:57:26 EST 2016


We'll start the cable lacing after lunch today.

For those that are going to be participating in this effort, here's the knots you need to be familiar with.

Packer's knot
Transom knot
Overhand knot

> On Nov 4, 2016, at 5:43 PM, Yuri Gotra <gotra at jlab.org> wrote:
> 
> I connected and strain relieved R3 cables and started testing the inner barrel. There is a minor issue with R3S10T slow control cable that needs to be repaired.
> 
> For the next week, after testing R1-R3 the cables need to be tied to the support tube. R4 work will continue with testing, rotating and mounting on the tube. I finished kludging all modules which were removed from the barrel, checking current stability on the test stand.
> 
> Sahin and Todd, let's meet in EEL124 at 8 am on Monday.
> 
> Thank you