The SVT is ready to be fully powered up. 

Marc and I connected the remaining interlock cables. Java has been updated on the Mac mini in EEL/124. N2 is flowing (George said the current configuration matches the diagram) and EPICS has been restored to the values during KPP.

I currently left it with only LV on (used to check HFCP temperature connections). I didn't check HV yet, but figured that would be done when fully powered up.

--
Brian Eng
Detector Support Group
757-269-6018

> On Feb 22, 2017, at 10:10 AM, Yuri Gotra <gotra at jlab.org> wrote:
> 
> In preparation for the SVT commissioning activities in EEL124 please complete cable connections (chiller interlock cables and MPOD control cables are disconnected) and connect gas purging system (check with George for compliance with drawings). Only one bottle setup is approved by now by DA.
> Mac mini needs java update by sysadmin.
> Chiller reservoir is full, there are 2 more water bottles by the chiller.
> 
> Please let me know when SVT is ready for powering up.
> Thank you