[dsg-svt] [Dsg-hallbgas] Gas System cRIOs

Peter Bonneau bonneau at jlab.org
Fri Jul 20 10:35:46 EDT 2018


Yuri, 

We want to upgrade the hardware interlock cRio next week also. 
During the upgrade, we can use the manual override switches to prevent any dropping of interlocks. 




From: "Yuri Gotra" <gotra at jlab.org> 
To: "Brian Eng" <beng at jlab.org> 
Cc: dsg-hallbgas at jlab.org, "Hallb-eng" <hallb-engineering at jlab.org> 
Sent: Friday, July 20, 2018 9:34:40 AM 
Subject: Re: [Dsg-hallbgas] Gas System cRIOs 

Brian, 

Next week will be good as most of the time the detector will be off 
while we will re-install the MVT. 


On 7/20/18 9:30 AM, Brian Eng wrote: 
> Yuri, 
> 
> While the downtimes will be brief (possibly up to a few minutes to install software, less than a minute for reboots) there will be interruptions in the flow during those times. 
> 
> Will there be a time next week when it isn't powered on if you want us to hold off on upgrading the cRIO used for the SVT? 


_______________________________________________ 
Dsg-hallbgas mailing list 
Dsg-hallbgas at jlab.org 
https://mailman.jlab.org/mailman/listinfo/dsg-hallbgas 
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-svt/attachments/20180720/7bbbcf2c/attachment.html>


More information about the dsg-svt mailing list