[dsg-svt] DSG work request

Yuri Gotra gotra at jlab.org
Fri Jul 13 12:39:35 EDT 2018


Thank you Peter,

A comment on your statement on the flow meters. The models and the 
number of the flow meters purchased (no spares) were defined by the HBI 
group. I reported several times that this model is not designed to work 
in magnetic field. The flow meters failed the very first time the 
solenoid was turned ON. Please select a model which would be compatible 
with requirements of the detector and let me and Bob Miller know.


On 7/13/18 11:56 AM, Peter Bonneau wrote:
>
> DSG comments regarding these work requests are in *blue.*
>
> On 7/13/2018 9:55 AM, Yuri Gotra wrote:
>> For testing the cooling system in preparation of the SVT for beam 
>> operations it is critical to have measurements of the coolant flow. 
>> Both flow meters observed issues with correct reading of the flow. 
>> The flow meters have been disconnected from the cooling lines 
>> (control lines are still connected). Please test the flow meters asap.
> DSG will schedule in this request in with all the other work in Halls 
> B, C, and D we are doing in preparation for the upcoming run.
> Hall B SVT does not have  cooling system repair components (external 
> to the chillers) which was first mentioned in our email of 1/31/2017 
> (listed below).

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_svt/attachments/20180713/d07f3370/attachment-0002.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: gotra.vcf
Type: text/x-vcard
Size: 102 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_svt/attachments/20180713/d07f3370/attachment-0002.vcf>


More information about the dsg-svt mailing list