[dsg-hallb_svt] SVT testing
Yuri Gotra
gotra at jlab.org
Fri May 7 18:18:59 EDT 2021
Hello Brian,
We started purging and cooling the SVT to test R3. While we were
connecting it, we found 2 issues with Nanonics pins and broken
temperature connector on L1C (module 18). This connector was repaired
and glued before, we'll need to evaluate a possibility to fix it.
SB3 sensor is still malfunctioning.
-------------- next part --------------
A non-text attachment was scrubbed...
Name: gotra.vcf
Type: text/x-vcard
Size: 102 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_svt/attachments/20210507/07e275f5/attachment.vcf>
More information about the dsg-hallb_svt
mailing list