[dsg-hallb_svt] Few cable repairs

Yuri Gotra gotra at jlab.org
Thu May 20 11:40:39 EDT 2021


Hello Brian,


The CVT was moved to the hall and now is being installed on L1. The 
highest priority is to connect the chiller, ambient sensors, MFCs, and 
the interlocks so we can start cooling the SVT and purging. There is an 
OSP in the counting house to be signed.


On 5/20/21 9:48 AM, Brian Eng wrote:
> It looks like those connectors were left plugged in while it was being 
> moved.
>
> Does this mean that Krister and I should start cabling things tomorrow 
> or is that taking place at a different time? It wasn't clear to me 
> from the schedule presented when that would actually take place.
>
> Also in the table it listed PPE as required; is there some sort of 
> (T)OSP we should be following that documents that?
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_svt/attachments/20210520/75207481/attachment.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: gotra.vcf
Type: text/x-vcard
Size: 102 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/dsg-hallb_svt/attachments/20210520/75207481/attachment.vcf>


More information about the dsg-hallb_svt mailing list