[Dsg-hallc_controls] PT2026 Remote Reset
Brian Eng
beng at jlab.org
Mon Aug 13 17:18:03 EDT 2018
Hi Steve,
We ran the cable from the NMR to the HMS dipole rack. See the attached picture, it is coiled up and the ferrules are taped.
It was verified to work when the NMR had gotten stuck again, so it is definitely needed.
Let us know when it's connected and to which channel.
Thanks
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-hallc_controls/attachments/20180813/17334350/attachment-0001.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: NMR Relay cable at HMS rack.jpg
Type: image/jpeg
Size: 709727 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/dsg-hallc_controls/attachments/20180813/17334350/attachment-0001.jpg>
More information about the Dsg-hallc_controls
mailing list