[Dsg-hallc_controls] New NMR unit
Steve Lassiter
lassiter at jlab.org
Fri Jul 27 11:18:05 EDT 2018
Sorry
His name is Joe Meyer,
Steven
----- Original Message -----
From: "Steve Lassiter" <lassiter at jlab.org>
To: "Brian Eng" <beng at jlab.org>
Cc: "dsg-hallc controls" <dsg-hallc_controls at jlab.org>, "Eric Sun" <qsun at jlab.org>
Sent: Friday, July 27, 2018 11:16:50 AM
Subject: Re: [Dsg-hallc_controls] New NMR unit
Hi,
Josh Myer just dropped by and they do not have a magnet assembled that can produce >1T fields.
Lets shut for installing in the SHMS Dipole and ramping up the magnet next week.
Thanks
Steven
----- Original Message -----
From: "Brian Eng" <beng at jlab.org>
To: "Steve Lassiter" <lassiter at jlab.org>
Cc: "dsg-hallc controls" <dsg-hallc_controls at jlab.org>, "Eric Sun" <qsun at jlab.org>
Sent: Friday, July 27, 2018 11:15:02 AM
Subject: Re: [Dsg-hallc_controls] New NMR unit
I've yet to hear back from the magnet measurement group on testing with a magnet higher than 1T.
So I can't test much since the probe never gets a lock.
If you want to install the probe and NMR in Hall C we can test the tags/communication but without actually doing any actions, basically just read the field.
Since we know we can power cycle the unit remotely I think there is at least a fall back if communication proves unreliable, but I've maintained a connection/communication for at least a week continuously without any problems.
----- Original Message -----
> From: "Steve Lassiter" <lassiter at jlab.org>
> To: "dsg-hallc controls" <dsg-hallc_controls at jlab.org>, "Eric Sun" <qsun at jlab.org>
> Sent: Friday, July 27, 2018 10:48:14 AM
> Subject: [Dsg-hallc_controls] New NMR unit
> Hello all,
>
> What is the latest updates on the new NMR units?
> 1. Do is it now work with the PLC reliable?
> 2. How soon can it be tested within the SHMS Dipole magnet? (includes PLC
> programming and installation)
>
> 3. Is there a need to buy a unit for the HMS or will the older, existing NMR
> units work for the HMS Dipole?
>
> I need to write and submit a req fairly soon for another unit, multipexer and
> probes if the newer model NMR is needed fpr the HMS Dipole.
>
> Thanks
> Steven
_______________________________________________
Dsg-hallc_controls mailing list
Dsg-hallc_controls at jlab.org
https://mailman.jlab.org/mailman/listinfo/dsg-hallc_controls
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-hallc_controls/attachments/20180727/fd759948/attachment.html>
More information about the Dsg-hallc_controls
mailing list