> For my own clarification, I'm going to summarize the work requests from your
> last email:
>
> 1. Signals cable run from the NPS to FADCs: you've started
> procurement of the RG-58C signal cables that will go to the BNC to
> BNC patch panel for which the parts have already been purchased.
> Has anyone been assigned to fabricate these cables and to make
> this patch panel?
Yes -- both procurement and assembly has been taken care of. No work
needed on the DSG side. I just wanted you folks to be aware of the
status in case someone else came to the DSG with questions about it.
> 2. HV connector internal to the NPS detector: DSG has been making the
> ~1100 HV divider cables. It is my understanding that these cables
> will run from the PMT assemblies to the inner side of an HV patch
> panel integrated into the roof panel of the NPS chassis. Is this
> correct?
> - We are progressing along quite well with the cable fabrication
> (470 of 1100 completed so far).
Sounds great.
> 3. Procure parts for the 140' external multi-conductor HV cables
> (34 total):
> - We will be able to take over the procurement and fabrication of
> these long cables. Brian, George, and Marc will be able to
> handle the parts procurement,and Mindy will be able to handle
> the fabrication. Do you have any information on the SAMTEC
> connectors and the NPS Chassis?
I've attached a couple documents that should have the details you need.
NPS_Cables_Transparents.pdf
- See p.6 -- p.8 for the SAMTEC part numbers, and the pin map from the
Radiall connector <--> SAMTEC connector group.
NPS_frame_connector_layout.pdf
- A simple render of the patch-panel(s) on the exterior of the NPS
chassis.
NPS-cabling-inside-chassis_25Jun2019.pdf
- CAD render of the interior of the NPS detector chassis
> We've discussed this internally, and pending Patrizia's approval, we
> are ready to move forward with procurement and fabrication.
> Also, since neither you, nor Jack can make it to the meeting tomorrow
> I've gone ahead and canceled it and will reschedule.
Sounds good.
-- Brad
--
Brad Sawatzky, PhD <brads at jlab.org> -<>- Jefferson Lab / Hall C / C111
Ph: 757-269-5947 -<>- Fax: 757-269-5235 -<>- Pager: brads-page at jlab.org
The most exciting phrase to hear in science, the one that heralds new
discoveries, is not "Eureka!" but "That's funny..." -- Isaac Asimov
-------------- next part --------------
A non-text attachment was scrubbed...
Name: NPS_Cables_Transparents.pdf
Type: application/pdf
Size: 2303551 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/dsg-hallc_nps/attachments/20200721/667bc9fb/attachment-0003.pdf>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: NPS_frame_connector_layout.pdf
Type: application/pdf
Size: 669350 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/dsg-hallc_nps/attachments/20200721/667bc9fb/attachment-0004.pdf>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: NPS-cabling-inside-chassis_25Jun2019.pdf
Type: application/pdf
Size: 328604 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/dsg-hallc_nps/attachments/20200721/667bc9fb/attachment-0005.pdf>
More information about the Dsg-hallc_nps
mailing list