[Dsg-hallc_nps] met with Bogdan
Amrit Yegneswaran
yeg at jlab.org
Thu Dec 15 11:17:23 EST 2022
ok! ok!
run in parallel!
indeed!
________________________________
From: Aaron Brown <ambrown at jlab.org>
Sent: Thursday, December 15, 2022 11:13 AM
To: Amrit Yegneswaran <yeg at jlab.org>; Dsg-hallc_nps at jlab.org <dsg-hallc_nps at jlab.org>
Cc: Fernando Barbosa <barbosa at jlab.org>; Patrizia Rossi <rossi at jlab.org>
Subject: Re: met with Bogdan
Just to clarify, the total 800 capacitors would not be needed by the 10th of January.
But there would need to be a significant number done before then so they would be able to start the installation.
After that, the fabrication work and the installation work can run in parallel.
________________________________
From: Amrit Yegneswaran <yeg at jlab.org>
Sent: Thursday, December 15, 2022 11:10 AM
To: Dsg-hallc_nps at jlab.org <dsg-hallc_nps at jlab.org>; Aaron Brown <ambrown at jlab.org>
Cc: Fernando Barbosa <barbosa at jlab.org>; Patrizia Rossi <rossi at jlab.org>
Subject: Re: met with Bogdan
so 800 caps in ~10 days!
almost twice the rate of the french!
(this is a challenge even for our wonder woman!)
(in the mood i am the cushion would be useful for those who didn't plan on this)
mindy if you can please start and interlace it with your JEF-FCAL work.
i think FCAL stuff is not needed till may 2023
you can decide how to proceed.
contact me if you have a problem.
________________________________
From: Dsg-hallc_nps <dsg-hallc_nps-bounces at jlab.org> on behalf of Aaron Brown via Dsg-hallc_nps <dsg-hallc_nps at jlab.org>
Sent: Thursday, December 15, 2022 10:59 AM
To: Dsg-hallc_nps at jlab.org <dsg-hallc_nps at jlab.org>
Cc: Fernando Barbosa <barbosa at jlab.org>
Subject: [Dsg-hallc_nps] met with Bogdan
Hi Amrit and Mindy,
Tyler and I spoke to Bogdan this morning regarding the addition of a capacitor to the PMT divider bases for NPS.
It looks like they have found that the frequency band of the low voltage amplifier is too large and is generating noise.
The thought is to chop the frequency band by adding a capacitor (~500 pF) on the output of the divider base (think low-pass filter).
The attached photo shows the output of the divider base with a capacitor already installed.
Approximately 150 dividers have been equipped with capacitors already.
The dividers with the capacitors already installed will be tested before the holiday shutdown.
If the test goes well, they would like to start installing capacitors on the remaining divider PCBs.
There are ~800 capacitors that will need to be installed.
These are already on-hand (Chris Stanislav has them).
This would be time sensitive work.
The French team will be returning to the lab around January 10, 2023 to complete installation/instrumentation.
They can install between 40 and 50 PMTs (including dividers and shielding) per day, so there would need to be at least 50 to 100 completed before January 10.
This would provide a kind of cushion between their install rate and the availability of completed dividers.
I’m not sure what Mindy’s work load looks like at the beginning of next year, but does it seem like this is something DSG can do?
-- Aaron
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-hallc_nps/attachments/20221215/3215dce1/attachment.html>
More information about the Dsg-hallc_nps
mailing list