Hi Brad,

We're to a point where we are ready to do a preliminary test for the NPS low voltage control and monitoring in EPICS.

The general procedure for the test would be to load a read-only version of the IOC that only reads data from the MPOD. If that is successful, I'll try out an IOC that has the ability to set voltage and current set points. I anticipate the test taking about two hours.

Can a time tomorrow Wednesday 11/16 (or later this week) be scheduled where we can do this test when you all do not need the MPOD in case its settings get effected?

Thanks,

Tyler