[Dsg-halld_plc] [New Logentry] Re: Solenoid Gauss meter

beng at jlab.org beng at jlab.org
Thu Mar 8 16:05:01 EST 2018


Logentry Text:
--
While we were testing the other PXI chassis we checked the cabling for the B-Field signal.

The connection to the screw terminals on the terminal block of the ADC for this signal looked good.

The issue is probably upstream from this point.

---

This is a plain text email for clients that cannot display HTML.  The full logentry can be found online at https://logbooks.jlab.org/entry/3543919
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/dsg-halld_plc/attachments/20180308/11f64667/attachment.html>


More information about the Dsg-halld_plc mailing list