[Esr-users] CHL Back to normal

Dave Kashy kashy at jlab.org
Thu Oct 5 14:46:31 EDT 2017


Hi All,
The CHL is now being used to refill the 10,000 liter helium dewar at ESR. All needed Hall operations can resume. 

During this event the ESR could not fully hold the load of the magnets and targets that were on line.

The dewar lost ~300 liters in 24hrs 

Please send me the lead flow for each magnet current lead during this period as well as the status of each of your magnets.

Also if you had any flow being dumped to warm return other than leads such as end of line valve that keeps a TL cold open. Let me know that too and if you have a flow rate on that load please send it.


This will be a data point on our load vs capacity analysis.

Thanks
Dave