[Esr-users] Hall C SHMS Q2 ramping
Steve Lassiter
lassiter at jlab.org
Wed May 9 13:42:27 EDT 2018
Hi,
This afternoon after 3:30pm The SHMS Q2 will be energized and fast dump measurements at low currents will be done.
This setup will have the warm gas valve in manual mode and shut. Any pressure burps will be forced to go back via the cold return line. These He pressure burps will be monitored and testing will stop before they reach a level that will trip off the turbines in ESR.
Steven