The following Power Outage has been Proposed:
Outage: Power Connection for Test Lab Skylight Motorized Shades
Proposed By: Josh Caterbone
Start Time: 12/10/2014 05:00
End Time: 12/10/2014 07:00
Description/Impacts:
This outage is to connect power from panelboard AP-2G-1 to the motorized shades being installed on the 2 skylights on the second floor of the test lab.
This outage will affect all office space and conference room 120V receptacles on the second floor, coffee makers, copy machines, refrigerators, and microwaves.
Impacted Areas:
Bldg 58: Test Lab