[Utility Outage] Proposed Power Outage - 09/17/2014 07:00
David Fazenbaker
fazenbak at jlab.org
Tue Sep 16 13:52:07 EDT 2014
The following Power Outage has been Proposed:
Outage: Test Lab 1137 Injector Lab Outage
Proposed By: David Fazenbaker
Start Time: 09/17/2014 07:00
End Time: 09/17/2014 12:00
Description/Impacts:
Panel P3L6 is being shut down to facilitate tying the new 480 to 240 transformer into the existing 480v panelboard. All 480/277 and 208/120 power in the room will be affected. No additional areas outside of room 1137 are affected.
Impacted Areas:
Bldg 58: Test Lab
For more details, visit the webpage listed below:
https://cc.jlab.org/cgi-bin/infrastructure/Outage/OutageView?ident=1