The following Power Outage has been Confirmed:
Outage:      Test Lab 1137 Injector Lab Outage
Proposed By: David Fazenbaker
Start Time:  09/17/2014 07:00
End Time:    09/17/2014 12:00
Description/Impacts:
Panel P3L6 is being shut down to facilitate tying the new 480 to 240 transformer into the existing 480v panelboard. All 480/277 and 208/120 power in the room will be affected. No additional areas outside of room 1137 are affected.
Impacted Areas:
	Bldg 58: Test Lab