[Utility Outage] Scheduled Road Closure - 08/17/2015 08:00
    Suresh Chandra 
    chandra at jlab.org
       
    Fri Aug 28 14:24:40 EDT 2015
    
    
  
The following Road Closure has been Confirmed:
Outage:      Sills at Entrances to Truck Ramps for Hall A & B
Proposed By: Suresh Chandra
Start Time:  08/17/2015 08:00
End Time:    10/01/2015 17:00
Description/Impacts:
Dressing of Concrete on both sides of Sill at Hall B is complete.  Epoxy fill in some areas for Sill at Hall B was low &  has been corrected.  Traffic can resume tomorrow.
Work for Sill at Hall A is complete and traffic can resume.
Work on Hall B Sill will start on 8/24/2015 (Monday) and the traffic there will be blocked.
Sill at Hall A has been installed.  The entrance will be ready for use starting tomorrow (8/21/2015)
Work for Sill at Hall B will also start tomorrow (8/21/2015).
Steel Sills are to be installed at Entrances to Truck Ramps for Halls A & B.  During this period vehicular traffic thru the ramps for Hall A & B will be interrupted.  Job will first start at Hall A & then at Hall B.  If you have any questions, please contact me.
Suresh
Tel. 7248
Impacted Areas:
	Bldg 94: Experimental Hall B
	Bldg 101: Experimental Hall A
For more details, visit the webpage listed below:
https://cc.jlab.org/cgi-bin/infrastructure/Outage/OutageView?ident=50
    
    