The following Power Outage has been Proposed:
Outage:      Hall B TB-P1
Proposed By: J. Willoughby
Start Time:  12/12/2016 08:00
End Time:    12/12/2016 12:00
Description/Impacts:
Remove power from TB-P1 to re-locate make-up fan power over to emergency power.  This will remove 120/208 power from the following:
Receptacles in Hall B
EFTB2
Shunt Trip forward carriage
Honeywell Controls
Trailer 35
PSS Receptacle at top of ramp
Fire Alarm Preaction Panel
Air Compressor
Lighting Contactor
Impacted Areas:
	Bldg 35: Safety Trailer
	Bldg 94: Experimental Hall B