[Utility Outage] Proposed Power Outage - 12/12/2016 08:00
J. Willoughby
jasonw at jlab.org
Thu Dec 8 06:17:43 EST 2016
The following Power Outage has been Proposed:
Outage: Hall B TB-P1
Proposed By: J. Willoughby
Start Time: 12/12/2016 08:00
End Time: 12/12/2016 12:00
Description/Impacts:
Remove power from TB-P1 to re-locate make-up fan power over to emergency power. This will remove 120/208 power from the following:
Receptacles in Hall B
EFTB2
Shunt Trip forward carriage
Honeywell Controls
Trailer 35
PSS Receptacle at top of ramp
Fire Alarm Preaction Panel
Air Compressor
Lighting Contactor
Impacted Areas:
Bldg 35: Safety Trailer
Bldg 94: Experimental Hall B
For more details, visit the webpage listed below:
https://cc.jlab.org/cgi-bin/infrastructure/Outage/OutageView?ident=1
More information about the Fac_outages
mailing list