The following Power Outage has been Confirmed:
Outage: Test Lab EAP-LAB-1
Proposed By: J. Willoughby
Start Time: 12/28/2016 09:00
End Time: 12/28/2016 10:00
Description/Impacts:
Remove power from EAP-LAB-1 Emergency panel to tie in circuit. Thsi will remove power from the following racks on the top of the Injector Test Facility
Vacuum Rack
Cryo Rack
Network Rack
PSS1 Rack
LLRF rack
Impacted Areas:
Bldg 58: Test Lab
For more details, visit the webpage listed below:
https://cc.jlab.org/cgi-bin/infrastructure/Outage/OutageView?ident=3