[Utility Outage] Scheduled Power Outage - 07/20/2016 06:00

Josh Caterbone joshuac at jlab.org
Mon Jul 18 15:37:44 EDT 2016


The following Power Outage has been Confirmed:

Outage:      Tie in telecom circuits
Proposed By: Josh Caterbone
Start Time:  07/20/2016 06:00
End Time:    07/20/2016 06:30

Description/Impacts:
	Panel ATS-P2 (120/208 volt) in Bldg 89 will need to be de-energized to tie in circuits that were ran for the telecom room. See below for what will be affected: This outage will take 30 min. We will start at 6am and finish by 6:30am Wednesday July 20, 2016 ELECT. HEAT WOMEN BATH ELECT. HEAT MEN BATH REC. ELEC. RM REC. TEST AREA DEDICATED REC. PERIMETER WALL DEDICATED REC. PERIMETER WALL DEDICATED REC. PERIMETER WALL DEDICATED REC. PERIMETER WALL DEDICATED REC. PERIMETER WALL DEDICATED REC. PERIMETER WALL DEDICATED REC. PERIMETER WALL DEDICATED REC. PERIMETER WALL DEDICATED REC. PERIMETER WALL GFI REC. SOUTH WALL DEDICATED REC. PERIMETER WALL REC. TEST AREA REC. ON TRAY OUTSIDE THIS ROOM DECK LIGHTS REC. DECK LIGHTS REC. HOT WATER HEATER CONDENSER ELEC. RM EXHAUST FAN BATH REC. TEST CORD CABINET SECURITON CAB. DEDICATED REC. PERIMETER WALL DEDICATED REC. PERIMETER WALL DEDICATED REC. PERIMETER WALL DEDICATED REC. PERIMETER WALL DEDICATED REC. PERIMETER WALL DEDICATED REC. PERI
 METER WALL A.C. UNIT REC. PHONE BACKBOARD SPARE IN BOX ON TRAY CENTER OF ROOM MICROWAVE CAMP REC. CAMP REC. 

Impacted Areas:
	Bldg 89: Accelerator Technical Support