[Utility Outage] Scheduled Power Outage - 01/04/2019 08:30

John Riesbeck riesbeck at jlab.org
Thu Dec 6 09:44:00 EST 2018


The following Power Outage has been Confirmed:

Outage:      North Access NA2 switch board outage
Proposed By: John Riesbeck
Start Time:  01/04/2019 08:30
End Time:    01/04/2019 12:30

Description/Impacts:
We will be turning off the 277/480 volt NA2 switch board that feeds the: Motor Control Center, 67-LCWP-4, 
67-LCWP-2, Panel NAL, Panel NAP, transformer T2, and transformer T1 (NA-PP1).

Panel NAL includes: Lights in rooms 108, 107, 100, new pump Rm, and storage Rm; Unit Heaters; Air compressor Mezz #3, a welding outlet in the tunnel; Winch FLR. PLT. 1, 2, 3, & 4; Vac pump, 480v receptacles, Lite battery charger, AHU #1.

Panel NAP includes:
 Fans and louvers, outside lights, sprinkler air compressor, sprinkler release solenoid,  receptacles for treatment pumps sump pumps  vending machines water coolers, over head doors, helium relief dampers, tunnel antenna, tunnel battery charger, heat trace low trench and air dryer, mech. control panel, and water heater.

Panel PP1 includes:
TBD


Impacted Areas:
	Bldg 67: North Access
	Bldg 102: End Station Refrigeration