[g2p_ana] Fwd: beam studies meeting notes
Jixie Zhang
jixie at jlab.org
Fri Apr 6 10:26:35 EDT 2012
---------- Forwarded message ----------
From: Jay Benesch <benesch at jlab.org>
Date: Fri, Apr 6, 2012 at 10:23 AM
Subject: beam studies meeting notes
To: bteam at jlab.org, Brad Sawatzky <brads at jlab.org>, jixie at jlab.org,
pcollins at jlab.org, logue at jlab.org, Matt Bickley <bickley at jlab.org>
Cc: "Roger D. Carlini" <carlini at jlab.org>, Kent Paschke <paschke at jlab.org>,
Mark Pitt <pitt at vt.edu>
Monday acceleration configuration change was discussed briefly.
http://opsweb.acc.jlab.org/**CSUEApps/atlis/task/12284<http://opsweb.acc.jlab.org/CSUEApps/atlis/task/12284>
A semi-parasitic test that Qweak wants to do this weekend was discussed.
Step 6 involves dumping considerable beam on apertures. Joe agreed to
review and comment on it. Email since the ATLis was submitted suggests a
follow-on ATLis this weekend. The PD will make the call with advice from
Arne or his designee, Matt.
http://opsweb.acc.jlab.org/**CSUEApps/atlis/task/12298<http://opsweb.acc.jlab.org/CSUEApps/atlis/task/12298>
Wednesday beam studies
0830-0900 allsave, fopt, etc.
0900-1000 Linux orbit lock test, parasitic beam to halls possible. I'd
like to know if these locks "fight" in the same manner as the old ones,
which suggests tune beam to a dumplet for some of the testing.
http://opsweb.acc.jlab.org/**CSUEApps/atlis/task/12215<http://opsweb.acc.jlab.org/CSUEApps/atlis/task/12215>
1000-1100 Linux energy lock test, parasitic beam to halls possible
http://opsweb.acc.jlab.org/**CSUEApps/atlis/task/12266<http://opsweb.acc.jlab.org/CSUEApps/atlis/task/12266>
1100-1730 PEPPO no beam to halls
http://opsweb.acc.jlab.org/**CSUEApps/atlis/task/12299<http://opsweb.acc.jlab.org/CSUEApps/atlis/task/12299>
3h
http://opsweb.acc.jlab.org/**CSUEApps/atlis/task/12300<http://opsweb.acc.jlab.org/CSUEApps/atlis/task/12300>
2h
http://opsweb.acc.jlab.org/**CSUEApps/atlis/task/12199<http://opsweb.acc.jlab.org/CSUEApps/atlis/task/12199>
1.5h
1100-1730 C100 parasitic testing, ends when PEPPO does. If the lock
testers want to work only in the injector, this could start earlier.
http://opsweb.acc.jlab.org/**CSUEApps/atlis/task/12297<http://opsweb.acc.jlab.org/CSUEApps/atlis/task/12297>
1730-1930 restore (hopefully only one hour)
5 hours held in reserve for C100 issues when hall C changes to fourth pass
on Sunday, April 15, putting 720 uA through the C100s.
-----------------
No maintenance is planned. If there's some RF recovery that can be done
without entry, consult Steve.
--
Best Regards,
Jixie Zhang
Jefferson Lab - Hall A - A112,
757-269-5352
_______________________________________________
-------------- next part --------------
An HTML attachment was scrubbed...
URL: https://mailman.jlab.org/pipermail/g2p_ana/attachments/20120406/92799702/attachment.html
More information about the g2p_ana
mailing list