Minutes of Hall A Group Meeting April 23, 2013
1) Doug Higinbotham
a) From the senior staff meeting last week
i) The President?s budget has 4.1% growth on FY12 for Nuclear
Physics. Good news!
ii) The lab has been provided with funds until April 26
with no cut.
iii) No news yet for the rest of the fiscal year
2) Robin Wines
a) 12 GeV:
i) Working on beam line and raster drawings
ii) Work continues on HRS detectors; expect to finish in
the next 3 weeks.
b) SBS:
i) Yoke cutout has been detailed
ii) Still need to work on the modifications to the counter
weight steel
iii) Working on floor plates
iv) Trying to get an update from Brookhaven on the magnet
transfer. Have nothing yet. Will keep trying.
c) Working on Polarized 3He target
3) Ed Folts
a) Working on vacuum lines
b) Snout sieves and windows are in. Still need a single hole
collimator,
c) Re-cabling at the pivot
d) Generally working on OSP?s, fire loading, and Quadrupole
rails
4) Bert Manzlak
a) There will be an electrical safety review over the next
several weeks
5) Sasha Glamazdin gives a status report on the Møller Polarimeter
a) See
http://hallaweb.jlab.org/equipment/moller/Talks/HallA_2012_0
4_23.pdf
-JJL