[Halla_min] Minutes of Hall A Group Meeting: July 28, 2020
Stephanie Tysor
stysor at jlab.org
Mon Oct 26 09:14:05 EDT 2020
Minutes of Hall A Group Meeting: July 28, 2020
1. Thia Keppel
* Senior Staff
* Machine – lots of problems!
* Still likely 1 – 2 weeks (not official)
* No answer for what happens if we slide the start, depends on what happens
* Assume total run time maintained
* Tech Transfer TRC meeting this week
* Task force being created to oversee long shut down
* One Program Deputy
* Not a formal DOE project
* 8/7 Office of Enforcement Meeting
* Also SoLID pre-R&D meeting
* Supervisor safety questionnaire
* DOE labs have had some safety issues recently
* No/less walk-thrus during COVID
* Less safety worries on site
* EIC – risk workshop this next Thursday (Steve & Jessie attending)
* 9/9 – 9/11 OPA status review
2. Robin Wines
a. SBS
* ordering remaining small parts for beamline connections, submitted extra beamline shielding job to machine shop, ordered floor plates (tried to get highway plates, none in storage in our region)
* GMn clamshells delivered, ordering other parts for window.
* BB detector support extension drawings in checking
* corrugated beamline hanger analysis and drawings in checking
* lead wall modification analysis in checking
* cryo disconnect drawings in checking
* LCW hangers complete
* working on drawings of BB sieve holder
* working on design modification of BB field clamp
* completed layout of recent survey points for items in the Hall
* provided more geometry to Radcon for radiation analysis
* completed mods to ECal cooling test drawings
b. SoLID- continue on coil test piping and CCR plumbing
c. MOLLER- continue preparations for reviews
3. Jessie Butler
* Received and QA’d more parts for SBS.
* Continue welding together entrance beamline work platform.
* Continue fabricating parts for LCW water manifold platform.
* Check over vacuum systems.
* Checked out FSD interfaces and beamline valve operation.
* Review drawings from design team and continue to work on procedures for decommissioning RHRS.
* Additional work: S&A came down and mapped the area behind the green wall so that we can better understand where RHRS will be parked.
* The main AHU went down and FLM is working on the repair.
4. Featured Speaker: Ole Hansen; Hall A Counting House Upgrade
Stephanie Tysor
Hall A/C Administrative Assistant
Physics Division
Jefferson Lab
757-269-6005
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halla_min/attachments/20201026/eb6df228/attachment.html>
More information about the Halla_min
mailing list