[Halla_min] Minutes of Hall A Group Meeting: August 11, 2020
Stephanie Tysor
stysor at jlab.org
Mon Oct 26 09:14:37 EDT 2020
Minutes of Hall A Group Meeting: August 11, 2020
1. Steve Wood
* No Senior Staff Meeting
2. Robin Wines
* SBS
* Alignment data layout complete
* Hanger for corrugated beamline section complete
* Working on lead design for inside magnet
* Revised platform drawings for techs
* Submitted PR for BB support extension pieces
* Continue on ECal support
* Evaluating lead shielding wall modifications
* SoLID
* Completed connections for turret design for coil test
* Working with detector support group on controls
* Moller
* Completed interface matrix
* Started technical spec document
* Prep for review
3. Jessie Butler
* Continue fabricating parts for LCW water manifold platform.
* Continue working on SBS exit beamline modifications.
* Continue test fitting exit beam line shielding.
* Completed pre-beam checklist and hot checkout to lockup the hall for beam.
* Move detector parts to ESB for Brad S.
* Check helium levels in TED and Test Lab highbay areas for Bogdan.
* Investigate a problem with left shield hut AC and schedule the repair with FML.
* Conducted interviews for new hire position.
4. Run Coordinator Report – Chandan Ghosh
Stephanie Tysor
Hall A/C Administrative Assistant
Physics Division
Jefferson Lab
757-269-6005
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halla_min/attachments/20201026/e4e35636/attachment-0001.html>
More information about the Halla_min
mailing list