[Halla_min] Minutes of Hall A Group Meeting: August 18, 2020
Stephanie Tysor
stysor at jlab.org
Mon Oct 26 09:15:35 EDT 2020
Minutes of Hall A Group Meeting: August 18, 2020
1. Thia Keppel
* Senior Staff Meeting
* Run extended two weeks to 9/20, unlikely to further
* EIC
* Strong hadron cooling in planning – needed to reach high luminosity
* OPA review next month
* UITF
* 10µA goal, 7.2MeV last week
* lots of trips, but getting going
* Budget
* Continuing Resolution is the expectation
* Research budget remains an issue
* No MedCon5 -->4 news yet
* Won’t have United Way day, still have campaign
* New JLab Event Manager hired, Anita Chapman
* MOLLER Director’s Review this week
* SAD
* ~7 months of shut down
* PAC last week
* 7 approved experiments
* 2 C1 (technical only, no need to go to PAC)
* 5 C2 (back to PAC!)
* Request to asses systematics more rigorously
* Request for better proposal preparation (write better, remove flaws)
2. Robin Wines
* SBS
* Have received all parts for GEn-RP detectors
* Continue on ECal support and platform
* Updated ECal cooling test design
* BB field clamp modification in review
* Completed lead wall analysis
* Created welding travelers for conical beamline and LCW manifolds
* Analysis of corrugated beamline connection
* Reviewed sieve plate mechanisms
* SoLID
* Completed shielding drawing and continue on turret to spool piece connection
* MOLLER
* Prep for review, setting up design work on detectors
3. Jessie Butler
* Continue fabricating parts for LCW water manifold platform.
* Modification of SBS exit beamline is complete, new we are test fitting the shielding to make sure it fits.
* Machined a flange that's need to SBS installation.
* Repositioned gas bottle racks for the gas shed.
* Re-arranged hot work area inside building 98 to support construction on large frame for LCW manifold.
* Began cleanup efforts in Physics Storage.
* Additionally, there were two main access in the Hall during the week; One was on Friday to check the AC in the left shield hut.
* Found ice build-up on the evap coils so the unit was shut off and will check Freon levels at a later date.
* The second access was on Saturday morning in support of troubleshooting the beam line Moller quads.
4. Run Coordinator Report – Ciprian Gal
Stephanie Tysor
Hall A/C Administrative Assistant
Physics Division
Jefferson Lab
757-269-6005
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halla_min/attachments/20201026/e45168be/attachment.html>
More information about the Halla_min
mailing list