[Halla_parity] PREX Experiment status update

Robert Michaels rom at jlab.org
Thu Jun 3 14:33:04 EDT 2010


The test for hurricane preparedness went well and CHL did not even crash
from the power cut. Target vacuum is in the 10^-5 so we will be cooling
down the target shortly. We will lock up as soon as the cool down is well
on track so around 5 PM.
The target operator will be required swing shift and SL and 3rd will be on
stand by and will be most likely called in when the cool down is done.

Best regards,

Alexandre Camsonne
Current PREX Hall A run coordinator






More information about the Halla_parity mailing list