[Halla_running] [New Logentry] RC Status update (Tuesday)

brads at jlab.org brads at jlab.org
Tue Feb 2 09:30:02 EST 2016


Logentry Text:
--
<p>Some heavy construction (digging) started near the north linac yesterday morning and the vibrations turned out to interfer with the cryomodules on that line. Upper management decided to eat some penalty charges and defer the construction until after the spring run.  So, we lost a day but no major disruptions.<br><br>First beam to Hall A is now planned for Friday day-shift.  They'll try to steer up Hall B on Saturday.  Beam is still supposed to be delivered to Hall A/D over the weekend, but B has the priority.</p><p><strong>Thursday shifts and Friday OWL are cancelled.  Friday DAY shift should plan to come in as planned.</strong></p><p>Don't forget we are restarting our daily on-site meetings at 4pm in the Counting House conference room (2nd floor).  We'll run Bluejeans so offsite people can connect.  Connection instructions are at the bottom of the email.<br><br><strong>** Request for Tuesday 4pm meeting **</strong><br>As the new Run Coordinat
 or, I'd like to have a quick update on the following systems at the Tuesday 4pm meeting:</p><ul><li>HRS magnets</li><li>HRS detectors (left and right arms)</li><li>DVCS calorimeter</li><li>DAQ status</li><li>Beamline instrumentation/readout</li><ul><li>BCMs, BPMs, Harps</li></ul></ul><p style="text-align: left;">Please let me know what works, what doesn't, and what is being worked on.<br><br><br><strong>** Shift Staffing **</strong><br>There are a lot of gaps in the shift schedule during the weekend, and OWL shifts in general.<br>                  <em>--> Please sign up! <--</em><br>https://misportal.jlab.org/mis/physics/shiftSchedule/index.cfm?experimentRunId=HALLA-SPRING2016<br><br><br><strong>** Target Training -- Friday, Feb 5 **</strong><br>JP sent out an email Monday covering Hall A/C cryotarget target training.  Anyone who plans to take shift as a Target Operator, who has n
 ot previously been trained, will need to take a class, a practical training session, and a supervised practice before becoming a certified Target Operator. For more information, see<br>  http://hallaweb.jlab.org/equipment/targets/cryotargets/Halla_tgt.html<br>We will have one Hall A/C cryotarget training class on Feb 5 (Friday) 10--12 in CEBAF Center room A110. This will be the only class scheduled for this run period.  Please sign up by sending <jpchen at jlab.org> an email if you plan to attend the training class.  The practical training will occur soon after the target is cooled down.  This should happen early next week -- stay in touch with JP.<br><br><br><strong>** Email list **</strong><br>Note that future messages will be sent to the 'Hall A Running' mailing list only.  If you do not see this message with a [Halla_running] tag in the subject line, then you should sign up here:<br>https://mailman.jlab.org/mailman/listinfo/halla_running<br><b
 r><br><strong>** Bluejeans connection information for 4pm Meetings **</strong><br>Meeting ID: 4681676425<br>To join the Meeting:<br>https://bluejeans.com/4681676425<br><br>To join via Room System:<br>Video Conferencing System: bjn.vc -or- 199.48.152.152<br>Meeting ID: 4681676425<br><br>To join via Phone:<br>1) Dial:<br>         +1.888.240.2560(US Toll Free)<br>         +1.408.740.7256<br>         +1.408.317.9253(Alternate number)<br>         (see all numbers - http://bluejeans.com/numbers)<br>2) Enter Conference ID: 4681676425</p>

---

This is a plain text email for clients that cannot display HTML.  The full logentry can be found online at https://logbooks.jlab.org/entry/3374364
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halla_running/attachments/20160202/e7cc9717/attachment.html>


More information about the Halla_running mailing list