Logentry Text:
--
<p>A rough punchlist first, followed by the tentative plan for the next few days.
</p>
<hr/>
<strong>Exec summary</strong>
<hr/>

<ul>
  <li>We locked up the Hall Thursday SWING to allow MCC to begin steering 2-pass
  beam up the Hall A line (no Compton chicane, no target, no shift crew needed
  tonight)
  <ul>
    <li>Tune beam restriction in place (CW prohibited)
    </li><li>Target set to 'no target' position, and motion controller locked out
    </li><li>DVCS calorimeter moved as far back as possible
    </li><li>All HVs turned off
  </li></ul>
  </li><li>CH will be staffed starting Friday DAY shift.
  <ul>
    <li>We will be going to Controlled Access Friday morning to allow work to
    continue on the HRS dipole controls.
  </li></ul>
  </li><li>We plan to run 2-pass beam starting in SWING and through the weekend,
  focusing primarily on beamline instrumentation checkout and opportunistic
  detector work
  <ul>
    <li>5 uA CW limit on all solid targets (since target is warm)
    </li><li>can still run higher currents in 'no target' position
  </li></ul>
  </li><li>more details below...
</li></ul>
<hr/>
<strong>Hall Punchlist</strong>
<hr/>

<ul>
  <li>Everyone needs to read and sign the COO/ESAD/RSAD in the Counting House
  <ul>
    <li>see also <a href="https://logbooks.jlab.org/entry/3375013">https://logbooks.jlab.org/entry/3375013</a>
  </li></ul>
  </li><li>Harp scanner checkout [Buddhini]
  <ul>
    <li>Still in progress: see <a href="https://logbooks.jlab.org/entry/3374823">https://logbooks.jlab.org/entry/3374823</a> and follow-ups
    </li><li>Target harps not working, unclear if it is software or hardware...
  </li></ul>
  </li><li>CODA EPICS logging still has a few missing/dead variables [Alex, et al]
  </li><li>Mongi will run through the Shift Checklist and verify that:
  <ul>
    <li>it is up to date, and
    </li><li>all the necessary readbacks can still be found (and work)
  </li></ul>
  </li><li>Multiple HRS Magnet issues [Segal]
  <ul>
    <li>See <a href="https://logbooks.jlab.org/entry/3375471">https://logbooks.jlab.org/entry/3375471</a>
    </li><li>Right and Left Dipoles not working right now (NMR and controls issues)
    </li><li>Left Q1 has limit of 1800A, but stay below 1600A for time being
    <ul>
      <li>We need to ensure shift crew have appropriate instructions on how to set
      the LHRS momentum correctly given this limitation.
    </li></ul>
    </li><li>Right Q1 <em>is</em> working: 800 A software limit
  </li></ul>
  </li><li>RHRS DAQ deadtime problem [Alex, Bob, et al]
  <ul>
    <li>could be bad power supply in TS crate, Gunning asked to check it out
  </li></ul>
  </li><li>Raster readback issue corrected
  <ul>
    <li>still waiting for upgraded raster offset attenuators to be delivered [Cuevas]
  </li></ul>
  </li><li>Position, Energy, Current locks (and FFB) status unclear [MCC, Brad]
  <ul>
    <li>MCC informed and working on it
  </li></ul>
  </li><li>BPM issue from Fall should be corrected [Buddhini, Thir, Kijun, Pete Francis]
  <ul>
    <li>it's a little unclear if there are other issues... 
    </li><li>this will be a priority checkout when we get beam
  </li></ul>
  </li><li>Plan to move the LRHS to 25 degrees (verify) first thing Tuesday and then
  get it surveyed during Beam Studies [Brad]
  </li><li>HRS VDC readbacks on General Tools screen dead
  <ul>
    <li>update howtos and/or fix problems: <a href="https://logbooks.jlab.org/entry/3375499">https://logbooks.jlab.org/entry/3375499</a>
  </li></ul>
  </li><li>Arc scanner needs to be greased/oiled [Doug]
  <ul>
    <li>motion does work though, just makes a bad noise...
  </li></ul>
  </li><li>Arc Harp controls [new screen] does not work
  </li><li>xscaler display could use some updated labels and/or BCM information [Bob,
  Julie]
  </li><li>Significant issue with Moller target [Sasha, Roman]
  <ul>
    <li>target position/angle shifts when magnet ramped up, can not maintain alignment
    </li><li>troubleshooting should be pursued during Friday DAY shift and have plan
    ready for follow up during planned downtime on Mon/Tues
  </li></ul>
  </li><li>An updated Hall A BCM average current screen that uses the new BCM readouts
  has been requested, OPS/SW working on it [Brad, Kjeldsen, Alex]
</li></ul>
<hr/>
<strong>Completed Punchlist Items (new)</strong>
<hr/>

<ul>
  <li>Confirm coin. timing in DVCS DAQ with EDTM [Done]
  </li><li>Raster readback currents zero when on issue fixed [Barak, Kalyan]
  </li><li>The LHRS motion works (but was a bit flaky), LRHS moved to 38.64 deg
  </li><li>Hall A Halo Monitor reported to be not working/disabled
  <ul>
    <li>not critical path item, so will not follow-up at this time
  </li></ul>
  </li><li>Wien is set for nominal max polarization to Hall A for 2-pass beam (FWIW)
  </li><li>BCM readouts are reported to be working [Alex, Musson, Mack, Ciprian]
  <ul>
    <li>need to keep an eye on this though...
  </li></ul>
</li></ul>
<hr/>
<strong>Tentative plan for the near term -- detailed daily runplans to come</strong>
<hr/>
2-pass beam to Hall A over this weekend and we'll scratch the Compton Chicane
requirement (just go straight through).  See below for more details. As usual,
the farther in the future, the fuzzier the forecast...

<p><u>Thursday SWING -- Friday OWL</u>
</p>
<ul>
  <li>Target moved to the 'no target' position and motion locked out
  </li><li>The DVCS calorimeter will be moved to its safest position (farthest from the beam line).
  </li><li>Tune-beam ONLY (CW is prohibited)
  </li><li>MCC should be instructed to call the RC cell phone if necessary.
</li></ul>
<p><u>Friday DAY -- Weekend</u>
</p>
<ul>
  <li>2-pass beam, NO Compton chicane
  </li><li>Initial RHRS settings: P0 = 0.75 GeV/c, Angle = 48.75
  </li><li>Initial LHRS settings: P0 = 1.4  GeV/c, Angle = 38.64
  </li><li>Sieve plates:  OFF
  </li><li>Tasks will include (see <a href="https://hallaweb.jlab.org/wiki/index.php/Beamline">https://hallaweb.jlab.org/wiki/index.php/Beamline</a> )
  <ul>
    <li>Ion chamber calibration (need ensure MCC follows the new procedure) [MCC, Brad]
    </li><li>Establish energy, position and current locks (and FFB) [MCC]
    </li><li>Beam centering and BPM/Raster checks
    </li><li>BPM calibration vs Harps ("Bull's Eye Scan")
    </li><li>Rough BCM calibration (cross calibration Hall A BCMs vs Unser only, no FC2; non-invasive to other Halls)
    </li><li>Start detector checkout and calibration studies
    <ul>
      <li>LHRS / DVCS checkout
      </li><li>RHRS checkout: 
      <a href="https://hallaweb.jlab.org/wiki/index.php/HRS_Checkout_%28Experts%29">https://hallaweb.jlab.org/wiki/index.php/HRS_Checkout_%28Experts%29</a>
      <a href="https://hallaweb.jlab.org/wiki/index.php/HRS_Detector_Calibrations">https://hallaweb.jlab.org/wiki/index.php/HRS_Detector_Calibrations</a>
    </li></ul>
    </li><li>ARC energy measurement [Doug]
    </li><li>Set LHRS DAQ to readout FADC in LHRS (low priority)
    </li><li>...
  </li></ul>
</li></ul>
<p><u>Monday DAY</u>
</p>
<ul>
  <li>Hall A will go to Restricted Access for target cooldown
  </li><li>We will come back up at 1-pass after the target is cold
  <ul>
    <li>NO Compton chicane needed here either
  </li></ul>
</li></ul>
<p><u>Monday SWING --> for a few good integrated shifts</u>
</p>
<ul>
  <li>Run 1-pass CW beam
  </li><li>Sieve plates need to be on the RHRS for optics calibration
  </li><li>complete any critical beamline commissioning tasks that were not completed
  over the weekend
  </li><li>Run GMp optics calibrations studies (priority task)
  <ul>
    <li><a href="https://hallaweb.jlab.org/wiki/index.php/Spectrometer_Optics_First_pass_48p8d">https://hallaweb.jlab.org/wiki/index.php/Spectrometer_Optics_First_pass_48p8d</a>
  </li></ul>
  </li><li>...
</li></ul>
<p><u>Tuesday DAY: Beam Studies</u>
</p>
<ul>
  <li>MCC has 8 hours of Beam Studies during DAY shift
  </li><li>Move LHRS to 25 degrees and have it surveyed during beam studies
  <ul>
    <li>ask to survey center hole on Sieve plate, if possible
  </li></ul>
  </li><li><em>IF 1-pass optics work is completed, then we will come back up at 2-pass,
  otherwise stay at 1-pass and complete optics work</em>
</li></ul>
<p><u>Wednesday DAY --> Weekend</u>
</p>
<ul>
  <li>Pass change to 2-pass (if not already done)
  <ul>
    <li>move the RHRS to largest angle (~55 degrees), so DVCS calorimeter can
    reach 20 degrees
    </li><li>go THROUGH the Compton Chicane this time
    </li><li>Yves and Compton experts (Gaskell) need to be on-shift during steer up to
    make sure the Compton is threaded well
  </li></ul>
  </li><li>Run 2-pass production quality beam
  </li><li>Complete remaining DVCS calibration tasks and/or pending beamline
  commissioning tasks
  </li><li>Possible Moller commissioning and/or dedicated Compton Commissioning
  </li><li>Get the 2-pass DVCS production data in the can
</li></ul>


---

This is a plain text email for clients that cannot display HTML.  The full logentry can be found online at https://logbooks.jlab.org/entry/3375517
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halla_running/attachments/20160204/c665c62d/attachment.html>


More information about the Halla_running mailing list