All of the important 1-pass optics runs were taken overnight. We're just waiting on two more points of a delta scan, and then we can give up the beam to MSS (at about 9 am) to do tuning for 4-pass. During the beam tuning, we can have a 1-hour access to do the following.
-- Techs move L-HRS to 26.3 degrees
-- DVCS calorimeter to 11.73 degrees, r = 2.5 m
-- R-HRS trigger (T3) diagnosis and repair
We have only 10 keys, so the shift leader should control who goes in, and each task should keep their personnel to a minimum. Try to keep the access to <= 1 hour, though it can spill over a little bit.
Once we have 4-pass beam, the Compton folks will need to re-establish Compton with help from accelerator (probably Yves).
Then we go into production mode for the weekend. DVCS kinematics Kin48_3 and the 4th-pass GMp program as per HALOG 3384306
https://logbooks.jlab.org/entry/3384306
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/3384734
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halla_running/attachments/20160226/19ba40a4/attachment.html>
More information about the Halla_running
mailing list