We had a fantastic 24 hours yesterday. The beam was stable and we got a lot done:
- We finished the 22˚ angle setting for low-side, x=1, and high-side settings
- We finished the 25˚ angle setting for low-side, x=1, and high-side settings
- We completed a combined BCM calibration / boiling study
- We are almost done with the 30˚ angle setting
- On the right side, we moved the momentum to cover the high side of x=1
We've got less than 24 hours left, and here is what we want to do:
- On the left HRS
* add an x>1 setting at 30˚
* complete 34˚ and 38˚ settings
- On the right HRS
* switch to low side of x=1 sometime during swing shift tonight
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/3573098
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halla_running/attachments/20180505/c4bbada7/attachment.html>
More information about the Halla_running
mailing list