Since the beam was delivered to the hall (~3:00pm yesterday), the following tasks have been done:
1) target frame hunting at low beam current
2) production run at 50uA and checking the data
3) current scan (5-70uA), main and SAM detector HV calibration at 70uA
4) production run at 70uA (1.5hour) with 12x7.2 raster
5) IA and PITA scan
6) go back to 50uA production
7) PQB studay
The FFB test is ongoing, and we need to do the BPM gain calibration at 70uA and prepare the MOLLER commissioning (DAQ, BCM) during the day shift. We are working on the plan to fix the analog BCM signal.
We will have our regular RC meeting in the counting house conference room at 3:30 PM.
Bluejeans ID: 256 205 934
(Direct link: https://bluejeans.com/256205934)
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/3706281
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halla_running/attachments/20190718/9ffdd34c/attachment.html>
More information about the Halla_running
mailing list