[Halla_running] [New Logentry] Daily update 2019-03-06
jlzhang at jlab.org
jlzhang at jlab.org
Wed Mar 6 09:45:03 EST 2019
Logentry Text:
--
Accelerator setting up is ongoing. The hall is still in controlled access for today.
All shifts for today and owl shift of Thursday are cancelled.
Yesterday, polarities for right arm and septum correctors were changed by Tech experts. Roman checked Left arm VDC relay box and restored the control cable connection.
Due to RQ3 and R-Dipole liquid level issue, Jessie ramped down all cryo magnets (LQ2, LQ3, LD1, RQ2, RQ3, RD1). The issue will be further investigated.
No daily run meeting today.
---