After some storm related trouble and allowing Hall C to finish up their Moller measurement we received beam last night through the chicane at around 10pm. Together with the shift crew Adam and Juan Carlos commissioned the Compton photon detector and we started taking data with FFB on. During the night OPS could not keep the backgrounds low enough to run 150uA so we dropped down to 120 until morning.
OPS is going into a ~2h beam studies and we will take this opportunity to make an access. As far as I know only Devi, Chandan (working on the DS detectors) and Alexandre (for the Compton e-detector) need to go in. As soon as the beam studies is over we will work with MCC (and optics experts) to reduce the Compton backgrounds and hopefully get us to 150uA through the chicane.
The rest of the day we plan to just take production data.
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/3826372
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halla_running/attachments/20200813/4161c81a/attachment.html>
More information about the Halla_running
mailing list