Logentry Text:
--
Finally yesterday we didn't have any major down. Overall we managed to have about a 50% efficiency for data taking (down time mostly due to beam trips).
Shujie tested the BPM cavity signal from the spare in preparation for testing of a LBNL designed box (https://logbooks.jlab.org/entry/3829370)
Doug made an energy measurement: https://logbooks.jlab.org/entry/3829334
This morning the accelerator went down to address some maintenance of cryomodules. We took the opportunity to look at the electron detector (https://logbooks.jlab.org/entry/3829889) and to fix the AC unit in the LHRS (https://logbooks.jlab.org/entry/3829908). Yan took a look at the injector and we have verified that the parity quality was ok (https://logbooks.jlab.org/entry/3829878).
We are now recovering from the down and should start back production. The plan for the next 24h: production until 8 30 tomorrow morning when we will do a Moller measurement.
We will have an RC meeting at 3 30 PM: https://bluejeans.com/256205934
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/3829962
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halla_running/attachments/20200818/936fbd36/attachment.html>
More information about the Halla_running
mailing list