During the RC/PD planning meeting this morning, vacuum experts came up with an alternative plan to address the bad vacuum that is in the beam switch yard without needing to make an access into the switch yard and bring halls B and C down. Hall A can also stay in controlled access during this work. Along with this work, additional work will be done on valve VBV1H00A along the beam line which they were unable to open last night / this morning. It sounds like in total this work will take most of the DAY shift. If all goes well, we can perform a checkout of the beam profile and raster and start back with production sometime during the SWING shift. Also important to mention is that we currently have shift openings for MONDAY OWL (Target Operator) and MONDAY DAY (Shift Leader).

Since there was a lot of activity the past 24 hours, I propose we have a short RC meeting at 3:00 pm to go over how things are progressing.
Best Regards,
Mike Nycz, Hall A RC

Meeting details:
Time: Daily at 3:00pm
Location: Counting house conference room

Join ZoomGov Meeting
https://jlab-org.zoomgov.com/j/1619032184?pwd=aWhTVWxya1ZZQzA1K2ZPSTd2ZX
Meeting ID: 161 903 2184
Passcode: 260715
Dial by your location
+1 669 254 5252 US (San Jose)
+1 646 828 7666 US (New York)
+1 551 285 1373 US
+1 669 216 1590 US (San Jose)
833 568 8864 US Toll-free

---

This is a plain text email for clients that cannot display HTML.  The full logentry can be found online at https://logbooks.jlab.org/entry/4066782
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halla_running/attachments/20221023/5eab301a/attachment.html>


More information about the Halla_running mailing list