RC daily update 10/19
Hall was brought back into beam permit around 10:30 pm last night after a significant amount of laser work by the target group, see the log below.
We started with a Moller measurement but there was significant beam time down during most of owl shift.
Moller was started around 5:30 am and finished at 8 am with a polarization of ~80.6%
The sieve was inserted with an escorted access at 8:30 am and we are currently ready to take beam when the machine is back from an SL access.
Latest NMR was taken at 7:30 with 43.8% polarization and still spinning up.
Maintenance Day Activities:
GRINCH gas bottle swap - https://logbooks.jlab.org/entry/4202414
ECal heater test prototype reset - (https://logbooks.jlab.org/entry/4202418
GEM HV trip investigation - https://logbooks.jlab.org/entry/4202439
BBCal Trigger setup for ALL – https://logbooks.jlab.org/entry/4202617
Target/Laser work – https://logbooks.jlab.org/entry/4202749
GEMs APV Issue causing DAQ to crash – https://logbooks.jlab.org/entry/4202616
Run Plan:
Day:
Take single carbon foil with magnets OFF optics data
Take multi carbon foil optics data with magnets ON
Remove sieve and resume production data.
Swing/Owl:
Production data
__________________________________________________________________________
We will have the regular RC meeting at 3:30pm in the Counting House conference room.
Alternately, people can join remotely via:
https://jlab-org.zoomgov.com/j/1616220064
Meeting ID: 161 622 0064
Passcode: 314159
---
This is a plain text email for clients that cannot display HTML. The full logentry can be found online at https://logbooks.jlab.org/entry/4202939
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halla_running/attachments/20231019/e326a51c/attachment.html>
More information about the Halla_running
mailing list