[Halla_running] [New Logentry] Daily RC update, 2024/05/03

efuchey at jlab.org efuchey at jlab.org
Fri May 3 09:50:01 EDT 2024


Logentry Text:
--
After the access in the Hall to fix the GEMs, we took data on LH2 at several currents and with several HV settings for the GEMs to evaluate the most optimal setting. 
Results are posted here: 
https://logbooks.jlab.org/entry/4294620 
https://logbooks.jlab.org/entry/4294797 
https://logbooks.jlab.org/entry/4294798

After that, we got back to production on LD2 at 10uA around 6pm. Production is still going pretty smoothly, albeit with a few occasional DAQ issues.
No major issue from the accelerator since yesterday.

Plan is to continue production throughout the weekend until Monday ~9am, when we will go to controlled access to allow GEM experts, recoil polarimeter experts and ECAL experts to work in the Hall.
This access as been mentioned today during the MCC RC meeting. I've reauested radcon support to David Hamlette who was present, and followed up with him and the techs.
 
We will have meeting at 3:30 today, counting house 2nd floor.
     Zoom connection link: https://jlab-org.zoomgov.com/j/1616220064
    Meeting ID: 161 622 0064
    Passcode: 314159

Daily RC wiki page:
https://sbs.jlab.org/wiki/index.php/RC_meeting_and_Run_Plan,_Friday_May_3rd

---

This is a plain text email for clients that cannot display HTML.  The full logentry can be found online at https://logbooks.jlab.org/entry/4295368
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/halla_running/attachments/20240503/52766dee/attachment.html>


More information about the Halla_running mailing list