[Hallb-engineering] Fwd: Hall B hot checkout near 4pm
Alexandre Deur
deurpam at jlab.org
Thu Apr 28 09:11:04 EDT 2011
I am sorry Volker, I mistyped: we will be coming back to restricted
access, not controlled access. Thank you for pointing this out.
Alexandre
On Thu, 28 Apr 2011, burkert wrote:
> Alexandre,
> We should probably go back to restricted access, not controlled access.
> Volker
>
> On 4/28/11 8:42 AM, David Kashy wrote:
>> Contact Alex or me if you need to change the plan.
>> Thanks
>> Dave
>>
>>
>> -------- Original Message --------
>> Subject: Hall B hot checkout near 4pm
>> Date: Thu, 28 Apr 2011 08:40:15 -0400 (EDT)
>> From: Alexandre Deur <deurpam at jlab.org>
>> To: Andy Sandorfi <sandorfi at jlab.org>, Douglas Tilles <tilles at jlab.org>,
>> Dave Kashy <kashy at jlab.org>, Mahbub Khandaker <mahbub at jlab.org>
>>
>>
>>
>> Gentlemen,
>>
>> MCC is planning to do the Hall B hot checkout today. The plan is that
>> around 4pm, when the Hall B technicians are done with the day, MCC sweeps
>> and locks up the Hall. The Hall sweep + check out should last about an
>> hour so the Hall will go back to controlled access around 5pm and the HD
>> work can resume.
>>
>> Please let me know if this upsets your work of the day. The plan is
>> flexible and can be delayed a few hours if 4pm interferes with your work.
>>
>> Thank you,
>>
>> Alexandre
>>
>>
>> _______________________________________________
>> Hallb-engineering mailing list
>> Hallb-engineering at jlab.org
>> https://mailman.jlab.org/mailman/listinfo/hallb-engineering
>
>
More information about the Hallb-engineering
mailing list