Alexandre,
  We should probably go back to restricted access, not controlled access.
Volker

On 4/28/11 8:42 AM, David Kashy wrote:
> Contact Alex or me if you need to change the plan.
> Thanks
> Dave
>
>
> -------- Original Message --------
> Subject: 	Hall B hot checkout near 4pm
> Date: 	Thu, 28 Apr 2011 08:40:15 -0400 (EDT)
> From: 	Alexandre Deur <deurpam at jlab.org>
> To: 	Andy Sandorfi <sandorfi at jlab.org>, Douglas Tilles 
> <tilles at jlab.org>, Dave Kashy <kashy at jlab.org>, Mahbub Khandaker 
> <mahbub at jlab.org>
>
>
>
> Gentlemen,
>
> MCC is planning to do the Hall B hot checkout today. The plan is that
> around 4pm, when the Hall B technicians are done with the day, MCC sweeps
> and locks up the Hall. The Hall sweep + check out should last about an
> hour so the Hall will go back to controlled access around 5pm and the HD
> work can resume.
>
> Please let me know if this upsets your work of the day. The plan is
> flexible and can be delayed a few hours if 4pm interferes with your work.
>
> Thank you,
>
> Alexandre
>
>
> _______________________________________________
> Hallb-engineering mailing list
> Hallb-engineering at jlab.org
> https://mailman.jlab.org/mailman/listinfo/hallb-engineering

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20110428/68a6d539/attachment-0002.html>


More information about the Hallb-engineering mailing list