[Hallb-engineering] Target preparation

Steve Christo christo at jlab.org
Tue Mar 22 07:35:17 EDT 2011


We will need a turbo pump station attached to the cryotargets vacuum 
jacket. The target is ready for it. Can be attached in the same place as 
before. Again, please do not turn the turbo cube off during target 
operation. The alarm for FV_CVS can be turned back on at any time. Thanks.
Steve




More information about the Hallb-engineering mailing list