[Hallb-engineering] Target preparation

Krister Bruhwel bruhwel at jlab.org
Tue Mar 22 09:30:01 EDT 2011


The signal is back in the paging system.

Regards,
Krister

Steve Christo wrote:
> We will need a turbo pump station attached to the cryotargets vacuum 
> jacket. The target is ready for it. Can be attached in the same place as 
> before. Again, please do not turn the turbo cube off during target 
> operation. The alarm for FV_CVS can be turned back on at any time. Thanks.
> Steve
>
> _______________________________________________
> Hallb-engineering mailing list
> Hallb-engineering at jlab.org
> https://mailman.jlab.org/mailman/listinfo/hallb-engineering
>   



More information about the Hallb-engineering mailing list