[Hallb-engineering] HDice He Level Signal
Krister Bruhwel
bruhwel at jlab.org
Tue Apr 24 17:05:48 EDT 2012
Hello,
Chris Bass and I installed the hardwired HDice He level signal today.
Here is the EPICS signal: "hdice:mainbathLL"
I have put into the time histories under the "HD Ice IBC" group as "He
Bath Level Hard Wired" and its updating as it should thus far.
Let me know about alarms and whatever else one might want with this signal.
clasrun at clon01:clasrun>caget hdice:mainbathLL
hdice:mainbathLL 72.6482
Regards,
Krister
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20120424/c5a8cd75/attachment-0002.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: bfbfhebj.png
Type: image/png
Size: 4752 bytes
Desc: not available
URL: <https://mailman.jlab.org/pipermail/hallb-engineering/attachments/20120424/c5a8cd75/attachment-0002.png>
More information about the Hallb-engineering
mailing list