[Hallb-engineering] fiducialization of all 12 GeV detectors

Doug Tilles tilles at jlab.org
Thu Mar 22 13:55:12 EDT 2012


To All

I have been asked to give a schedule for fiducialization survey for each 
12 GeV  detector unit.
Could the people who are in charge of each system please give me a 
schedule for when there units will be ready to survey.

Doug




More information about the Hallb-engineering mailing list