[Hallb-engineering] Drift Chamber Strong Backs

Douglas Tilles tilles at jlab.org
Tue Oct 29 10:27:42 EDT 2013


To All:

All of the Load Tests for the Drift Chamber Strong-backs are complete. 
All Documentation is being turned in to Civil Eng.
I would like to thanks Bob, Calvin and the Randy 5000 hoist system, who made it possible to keep using the Hall crane even during the Hoist down time that is still on going.

Doug



More information about the Hallb-engineering mailing list